Generator Performance Standards
The Power and Water Corporation submitted proposed amendments to the Network Technical Code and System Control Technical Code to implement new Generator Performance Standards.
Status: final
- Initiate
- Draft
- Consultation
- Final
On 29 February 2020, the Commission made its Final Decision in relation to the Power and Water Corporation’s proposed amendments to the Network Technical Code and System Control Technical Code to implement new Generator Performance Standards.
In accordance with the Utilities Commission Act 2000 and good regulatory practice, the Commission undertook a due diligence process in considering the proposed amendments and making its decision. This included, among other things, consideration of stakeholder feedback provided to the Power and Water Corporation through its two rounds of formal consultation.
The Commission released its Draft Decision on 4 December 2019, including advice from its technical advisor GHD Advisory and undertook consultation on its Draft Decision. The Commission received six submissions from interested parties.
The submissions informed the Commission's Final Decision, including additional advice from GHD Advisory in relation to issues raised by stakeholders.
Related documents
Initiate
Power and Water Corporation Review of the Northern Territory Generator Performance Standards
Draft
Draft Decision - PWC Generator Performance Standards
Advice - GHD Report - PWC Generator Performance Standards
Consultation
Assure Energy submission to GPS Draft Decision
Eni Australia submission to GPS Draft Decision
Jacana Energy submission to GPS Draft Decision
NT Solar Futures submission to GPS Draft Decision
PWC submission to GPS Draft Decision
Territory Generation submission to GPS Draft Decision
Final
Final Decision - PWC Generator Performance Standards
Advice - GHD Report - Review of issues raised in submissions