Skip to main content Skip to main navigation
Utilities Commission NT Logo
Search
  • Home
  • About
    • Commission
    • Strategic plan
    • Engagement
    • Annual report
    • Careers
    • Contact us
  • News
  • Contact us
  • Water and sewerage
    • Licensing
    • Codes and guidelines
    • Reporting
    • Price regulation
    • Projects
  • Electricity
    • Licensing
    • Codes and guidelines
    • Reporting
    • Price regulation
    • Projects
  • Ports
    • Codes and guidelines
    • Reporting
    • Access regulation
    • Price regulation
    • Projects
  • Publications
  • Projects
    • Open for consultation
  • Home
  • News
  • 2020
  • Approval of Power and Water Corporation’s 2020-21 system control charges
08 Apr 2020

Approval of Power and Water Corporation’s 2020-21 system control charges

The Commission has approved Power and Water Corporation’s 2020-21 system control charges to be applied by the power system controller from 1 July 2020.

On 31 March 2020, Power and Water Corporation submitted to the Commission its 2020-21 Annual Pricing Proposal for System Control and Market Operator charges.

The Commission has assessed the Pricing Proposal as compliant with the Commission’s System Control Charges Final Decision for the 2019-20 to 2023-24 regulatory period and as such, approved the proposed charges.

The charges approved for 2020-21 are the maximum that Power and Water Corporation can charge for services provided by the power system controller with respect to its regulated electricity networks.

More information regarding the regulation of system control charges and other electricity charges can be found on the electricity price regulation page.

News

  • 2025
  • 2024
  • 2023
  • 2022
  • 2021
  • 2020
  • 2019
  • 2018
  • 2017
  • 2016
  • 2015
  • Copyright, disclaimer and privacy
  • Freedom of information
  • Interpreter services
  • Site map
  • Contacts
  • Feedback

© 2025 Utilities Commission Northern Territory

Back to top