Skip to main content Skip to main navigation
Utilities Commission NT Logo
Search
  • Home
  • About
    • Commission
    • Strategic plan
    • Engagement
    • Annual report
    • Careers
    • Contact us
  • News
  • Contact us
  • Water and sewerage
    • Licensing
    • Codes and guidelines
    • Reporting
    • Price regulation
    • Projects
  • Electricity
    • Licensing
    • Codes and guidelines
    • Reporting
    • Price regulation
    • Projects
  • Ports
    • Codes and guidelines
    • Reporting
    • Access regulation
    • Price regulation
    • Projects
  • Publications
  • Projects
    • Open for consultation
  • Home
  • Electricity
  • Codes and guidelines
  • Electricity Industry Performance Code and Guidelines
  • Network target standards

Network target standards

The Electricity Industry Performance Code requires network entities to develop and submit network target standards to the Commission for approval for each regulatory control period. Network entities are required to propose target standards based on System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Index (SAIFI) performance indicators. SAIDI is an index showing the duration that customers are without electricity, while SAIFI is an index showing the frequency of interruptions to customers’ electricity supply.

A network entity must use its best endeavours to be meet the approved network target standards during the relevant regulatory control period.

Approved network target standards

Commission approved network target standards for Power and Water Corporation’s 2019-2024 and 2024-2029 regulatory control periods are shown in the table below.

 2019-20242024-2029
Feeder categorySAIDI
(minutes)
SAIFI
(interruptions)
SAIDI
(minutes)
SAIFI
(interruptions)
CBD40.140.1
Urban1402.0801.4
Rural short1903.01903.0
Rural long150019.0126015.0

Electricity

  • Toggle
    Licensing
    • Licence application
    • Register of electricity licences, exemptions and dedicated connection assets
    • Complaints
  • Toggle
    Codes and guidelines
    • Toggle
      Electricity Industry Performance Code and Guidelines
      • Feeder Category Guidelines
      • Guaranteed service levels
      • Independent Compliance Audit Guidelines
      • Network target standards
    • Electricity Ring-fencing Code
    • Electricity Retail Supply Code
    • Compliance Framework and Reporting Guidelines
  • Toggle
    Reporting
    • Electricity Retail Review
    • Power System Performance Review
    • Electricity Outlook Report
    • Power System Review
    • Annual Compliance Monitoring Report
    • Nhulunbuy Power System Performance Report
  • Toggle
    Price regulation
    • Electricity retail pricing
    • System control charges
    • Ancillary services charges
  • Projects
  • Copyright, disclaimer and privacy
  • Freedom of information
  • Interpreter services
  • Site map
  • Contacts
  • Feedback

© 2025 Utilities Commission Northern Territory

Back to top